Description
Use Instructions:
1. Ensure the floor is stripped, rinsed, and completely dry. Apply evenly with a polish applicator in overlapping 1–1.5 m lanes.
2. Apply 3 coats, allowing at least 60 minutes drying time between coats. After the final coat, allow 60 minutes before traffic.
3. Recoat every 3 months in medium/high traffic areas




